Homepage ASD-Network

Northrop Grumman Corporation News - Press Release Category: Defence

Featured Events

National Security 08

The Premier National Security and Counter Terrorism Conference

Date: 30 Sep 2008 - 2 Oct 2008
Venue: Hotel Le Plaza
Location: Brussels, Belgium


Current and Future Military Data Links

Defense Technology Seminar

Date: 18 Sep 2008 - 19 Sep 2008
Venue: Radisson Reagan National Airport*
Location: Washington, DC, United States



Featured Reports

Plimsoll Portfolio Analysis - Satellite Communication Equipment

Publisher: Plimsoll
Pages: 180

Corporate Review - SkyWest, Inc.

Publisher: Synergyst
Pages: 40

US Aerospace Industry Analysis

Publisher: RNCOS
Pages: 55

Search Companies

Find over 9000 Aerospace, Aviation, Space, Defence & Security companies & organisations.

NGC's MQ-8B Fire Scout to be Tested and Evaluated Early On An Additional Air-Capable Ship

(San Diego, February 20, 2008) -- The U.S. Navy has decided to integrate Northrop Grumman Corporation's (NYSE:NOC) MQ-8B Fire Scout Vertical Takeoff and Landing Tactical Unmanned Aerial Vehicle (VTUAV) onto another air-capable ship before it reaches the Littoral Combat Ship (LCS). The Fire Scout is still slated to go aboard the LCS, and the Navy remains committed to transitioning the Fire Scout in that direction.

The Fire Scout is a key enabler for LCS and significantly contributes to its designated warfare mission areas of anti-submarine warfare, surface warfare and mine warfare. The modular nature of the ship to accomplish the designated mission is perfectly complemented by the Fire Scout and its modular mission payload capability. However, due to changes in the LCS development schedule, the Navy intends to conduct the Fire Scout Operational Evaluation (OpEval) aboard a ship that will be designated by the U.S. Fleet Forces Command within the next thirty days. This will provide the fleet with unmanned aerial system support as soon as possible.

According to the current schedule, the Navy will conduct Technical Evaluation on the Fire Scout on the designated ship in the fall 2008 and OpEval in the summer 2009. The Fire Scout will reach Initial Operating Capability soon after OpEval in 2009. The Navy will continue to support LCS Initial Operational Test and Evaluation (IOT&E) efforts in fiscal year 2011.

"This is great news for the Navy and for the Fire Scout," said Doug Fronius, MQ-8B Fire Scout VTUAV program director for Northrop Grumman's Integrated System sector. "It's a win-win situation because the Fire Scout gets to progress through testing and initial operational capability. It will be ready to deploy on operational missions and will be ready when the LCS needs it."

Fire Scout VTUAV restructuring is in the best interests of the Fleet and the U.S. Navy Fire Scout VTUAV program because it enables the Navy to continue supporting LCS integration and will provide a more mature system for LCS deployments.

Source : Northrop Grumman Corporation

Recent News / Press releases from Northrop Grumman Corporation

Aerospace & Defence Network • the smart network • contact usterms & conditionsprivacy policy