Homepage ASD-Network

Arianespace News - Category: Space

HOT BIRD 9 Starts Integration With Ariane 5 Launch Vehicle Hardware

Featured Events

Unmanned Aircraft Systems

Platforms, Payloads & Opportunities

Date: 3 Mrch 2009 - 4 Mrch 2009
Location: San Diego, CA, United States


Airborne Networks Conference

Opportunities, Needs, Initiatives and Challenges

Date: 19 Mrch 2009 - 20 Mrch 2009
Location: Las Vegas, NV, United States



Featured Reports

Kuwait Defence and Security Report


Global Electronic Surveillance Market Outlook


US and EU HLS Communications Interoperability Markets and Technology Forecast - 2008-2012



Search Companies

Find over 9000 Aerospace, Aviation, Space, Defence & Security companies & organisations.

(November 18, 2008) -- The dual-satellite payload for Arianespace's sixth mission of 2008 is beginning its integration process with launcher hardware as preparations move forward for the year-end flight of HOT BIRD(tm) 9 and W2M at the service of Europe's telecommunications operator, Eutelsat.

These activities include the installation of HOT BIRD 9 on its cone-shape adapter unit, which functions as the interface between the satellite and its Ariane 5. The integration occurred this week inside the S5 payload integration building at the Spaceport in French Guiana.

HOT BIRD 9 was built by EADS Astrium, and is configured with 64 Ku-band transponders. With a liftoff mass of 4,880 kg., the satellite's high power output power will be used for digital and new high-definition TV channels, as well as interactive services. Its transmissions will be received by small direct-to-home antennas, and also are to be distributed through cable and community networks. The coverage area extends throughout Europe, and also reaches North Africa and the Middle East.

Source : Arianespace


Events related to this news release


Reports related to this news release


Recent News from Arianespace

ASD Network • the smart network • contact usterms & conditionsprivacy policyadvertisingfaqs